
Reviews
Part of Seven England web agencies named, and identity checks to run before reputation
Product comparison method for an England web brief: evidence table, WCAG-EM tests and pass or fail gates
A like-for-like method to compare a hosted builder, a site-plan builder and an existing system for one England brief: evidence table, WCAG-EM tests, gates.
Which evidence should an England organisation examine when replacing a small information website? This method compares two named candidates, WordPress.com Business and a Webflow site plan, with the existing system as a documented baseline. Each gets the same table, tests and gates. No winner is declared before the tests are run.
What to take away
- Treat the existing system as a documented baseline before assuming a replacement is better.
- Supplier documentation explains product mechanics but does not prove compliance or performance in England.
- Run the same synthetic content and authorised roles through both plans and the baseline.
- Keep privacy, security, licensing, procurement, contract and exit as separate gates that cannot offset each other.
- Hold the decision until exact proposals, qualified review and controlled tests exist.
One case and one evidence rule
The case is one public information site, run by a small editorial team, with recurring content revisions and accessibility needs for visitors and editors. Personal data is collected only if separately approved. E-commerce, membership and bespoke server code are excluded.
The named plan must be the exact edition and term. The two candidates here are a WordPress.com Business plan and a Webflow site plan, named as examples of a hosted builder and a site-plan builder; no claim about either is made beyond the evidence rows. Write down the product, edition, contracting entity and date of each record.
The baseline is not a product claim: document the present hosting, editor workflow, contract and known defects first. The tools and supplier guide shows how to record them.
Like-for-like evidence table
Fill the same table for every candidate and for the baseline. Leave a cell as unknown when the evidence is missing. An unknown stays open and never receives a midpoint score.
| Field | WordPress.com Business plan | Webflow site plan | Existing-system baseline |
|---|---|---|---|
| Service boundary | Features stated in the supplier's plan record | Features stated in the supplier's plan record | Buyer records current components and owners |
| Accessibility evidence | Supplier statement, configured output untested | Supplier statement, configured output untested | Test representative visitor and editor tasks |
| Data terms | Contract and privacy review needed | Contract and privacy review needed | Inventory parties, purposes, transfers and contracts |
| Export and exit | Documented export boundaries | Documented export boundaries | Authorised backup, restore and handover test |
| Support and full cost | Unknown until the exact order exists | Unknown until the exact order exists | Buyer-owned evidence, not assumed to be zero |
These records show what each supplier publishes, not that a configuration meets the brief. Supplier documentation explains product mechanics. It does not establish legal compliance or performance in England.
Accessibility tests with WCAG-EM
The W3C WCAG Evaluation Methodology is an approach for determining how well a digital product conforms to the Web Content Accessibility Guidelines. It sets out five steps: define the scope and conformance level, explore the product, select a representative sample, evaluate the sample and report the findings.
Applying it needs knowledge of WCAG, accessible design, assistive technologies and how people with different disabilities use digital products. Ask an independent specialist, not the supplier. The method is a supporting resource and does not define additional WCAG requirements.
Government accessibility requirements, which also satisfy the Public Sector Bodies (Websites and Mobile Applications) (No. 2) Accessibility Regulations 2018, include level AA of WCAG 2.2 as a minimum, work on the most commonly used assistive technologies and publish an accessibility statement, as the Service Manual accessibility introduction sets out. A private buyer can borrow the same three tests.
Control tests before a decision
Use the same synthetic content set and authorised account roles for every candidate. Record publishing, rollback, export, restoration, account recovery and support escalation outcomes in the same log.
Control of data is a core test. Make sure you have full control of any data you store, and reduce the chance of being locked in to long contracts for specific tools and providers. An export that cannot be restored is not an exit.
If the site will process personal data, you must determine your lawful basis before you start using it, and you must document it. Review data terms, roles and transfers with qualified advice. Read the commercial contracts records before signing anything.
Gates and verdict
Keep privacy and PECR, security, intellectual-property licensing, claims, procurement, contract, continuity and exit as separate gates. A strong result in one cannot offset a failure in another. The review methodology explains how a verdict is reached from gate results.
| Gate | Pass if | Fail if | Named reference |
|---|---|---|---|
| Privacy and PECR | A lawful basis is documented before personal data is used, and cookie and marketing rules are mapped | Personal data is collected with no recorded basis | ICO lawful basis guide, ICO PECR guide |
| Data terms | Processor terms cover the Article 28(3) details | The supplier handles personal data with no processor terms | ICO guidance on what the contract must include |
| Accessibility | A WCAG-EM sample passes level AA and editors can work with assistive technology | Key tasks fail or no independent test exists | W3C WCAG-EM, WCAG 2.2, Equality Act 2010 sections 20 and 29 |
| Security and supply chain | Sub-suppliers with data access are listed and meet your standard | Sub-suppliers with data access are unknown | NCSC cloud security principle 8 |
| Export and exit | An authorised export restores into a test site | The export cannot be restored | GOV.UK Service Manual on control of data |
| Contract and procurement | Term, renewal and cancellation are written and approved | Terms allow lock-in you cannot accept | GOV.UK Service Manual on lock-in |
For a private buyer, the Equality Act 2010 applies to service providers. Section 29 bars a service provider from discriminating against a person requiring the service, and section 20 sets the duty to make reasonable adjustments. The 2018 accessibility regulations apply to public sector bodies, so a private buyer borrows their tests, not their duty.
Until exact proposals, qualified review and controlled tests exist, the verdict is hold. Run the selection checklist at each gate. Repeat the comparison with fresh plan records before any 2027 decision, because supplier plans change.
For a worked contrast between a hosted builder and an open platform, read the guide to WordPress and website builders.
Before you act
- Confirm the exact edition and term of each plan before comparing anything.
- Document current hosting, editor workflow, contract and known defects.
- Ask an independent accessibility specialist to test representative tasks.
- Record publishing, rollback, export, restoration and support escalation outcomes.
- Review data terms, roles, transfers and contracts with qualified advice.
- Rerun the comparison with fresh plan records before any 2027 decision.
Common questions
Why does the comparison refuse to declare a winner?
Without exact proposals and controlled tests, any winner would rest on supplier marketing. The table records what each supplier publishes and leaves unknowns open until evidence exists.
What does the like-for-like table show?
It shows what each supplier publishes, not that a configuration meets the brief. Support, continuity and full cost remain unknown until the exact order and support evidence are obtained.
What must happen before replacing the existing site?
Run the same synthetic content and authorised roles through every candidate and the baseline, have an independent specialist examine representative tasks, and close each gate separately.



